Description
This Bridging system was first used in the British Army in the the early 70’s and has been exported to over 30 countries around the world.
It is transported in various man portable components in trucks and can be assembled by engineers very quickly and can span gaps up to 48 mtrs and is the floating pontoon version.
The Basic bridge model is in 3 parts and is 31cms long and 6cm’s wide and has 4 pontoon boats included.
The span will cover a river or gap of 28cms easily but we also have extra middle sections for those with wider rivers.
We can also supply extra pontoons and bridge decks.
Please Note:-
Truck not included.
Reviews
There are no reviews yet.